Site Preparation:• Complete slurry pool construction;• Harden and level the installation area

1. Site Preparation

• Complete slurry pool construction  

• Harden and level the installation area  

 

2. Hydrapulper Setup

• Position the hydrapulper according to the approved layout diagram

• Align the pulp outlet to discharge directly into the storage tank  

 

3. Agitation System Configuration

•  Install a 900mm-diameter agitator in the pulping tank  

• Transfer adjusted pulp to the pre-emptive tank (machine-front tank)  

• Equip the pre-emptive tank with:  

 ✓ 1500mm-diameter agitator

 ✓ Slurry pump  


4. Pipeline Connections

◆ Slurry Pump → Molding Machine:  

• Connect pump outlet to molding machine inlet B

◆ Molding Machine Ports:

• Outlet A (overflow): Return pipe to pre-emptive tank  

• Inlet D: Air compressor supply line  

• Inlet C/E: Vacuum pump supply line  


5. Vacuum & Air Systems

• Position vacuum pump and air compressor per site conditions  

• Connect vacuum pump intake to water reservoir via pipeline  

 

6. Operational Verification

• Confirm all connections are pressure-tight  

• Perform dry-run test before pulp introduction  

 